The Evolution of the Floating Power Barge


      <Tomorrows Elevator Power Platforms - Today>    


                                                                                        The Evolution of Modern Power Platforms

Because of the huge draw on new floating barges in the larger A1 Class of +300 feet, the attendant difficulty in locating suitable
moorings and the prohibitive costs surrounding their in-situ maintenance, and coupled with the high production costs & lead time,
 we decided to think outside the box and use a slightly more novel approach - which - once our engineers had studied & diagnosed
the actual cause & affect - decided it was indeed a no-brainer as we solved several rather profound problems that had evaded us
for some time previously - with our somewhat biased logic and jaded thought processes  ....  saving you time, saving you money

The JB are completely at home in inclement weather, turbulent seas and extremely harsh weather conditions - perfect for the job -
plus we save a whole bunch of time, dry dock fees and the dreaded rollover fear is completely eliminated. Most of the ultra large +
120MW floating Power Platforms have extremely high centre of gravity and have an inherent roll over factor if there is a short or
lock up in the turbine - trying to right one of these 500MT monsters is a complete no-no ... go home and wait for the lawyers to call

Because the JB is completely out of the water for all of its life - metal corrosion from salt and electrolysis is totally absent - no more
of those expensive monthly checks, cleaning and massive annual hull haulout bills - and it is completely stable - 4 and 6 legs a piece

We have cut expensive dry dock build time by 50% - we deploy sooner - you make power/money sooner - keep the populace happy

Right now we can offer 40MW  80MW & 120MW variants in under 90 day build times - they will burn HFO D2 or NG - we can
place the fuel skid and power transformer on a separate unit if required - please call or email us immediately if interested

No more uprisings and government overthrows, strikes and sabotage - witness all that plagues Africa & the Middle East - these are
not a bunch of crackpot fundamentalists who dont like the color of someones burqa - these are folks who dont have decent potable
water, ablutions, air conditioning and power to run their lives at basic human-being levels - stuff that we all take for granted - whilst
their rulers languish in Europe and the USA in palatial splendor and luxury - thats all they demand is a little bit of electricity - which
they are fully entitled to


     Yesterdays Floating Power Barge -    - Conventional, Expensive, Unstable
       

        
<  it doesnt get much simpler than this or this >  
                                                                             drag it in, jack it up, make power - one day!!
                                                                                                     
                                                                      
                                                                      B
igger is Better - a large semi can produce +500MW

We are commited to deliver the finest quality power from a wide range of fuel sources, including natural gas, coal, oil,

petroleum coke, wind, biomass solar and water. Rather than being tied to a single type of technology or force-fitting
a rigid solution, we identify what each particular market and environment can best support. This helps to bring
numerous benefits, including increased generation capacity and reliability and lower costs to consumers                               email

Design brief considers hurricane storm conditions and temporary loss of  gas supply, with diesel storage to maintain

generation availability. Consideration is given to reducing pollution by installing selective catalytic reduction (SCR)        
units to reduce NOX on the HRSGs. The power plant may be operated similarly to any land based combined cycle
generating facility, with on-board operators performing similar  functions. The multiple turbines, gas compressors
and transformers built into the design provide a high degree of redundancy

W e have a wide range of Mobile Power Containers & Trailers, which can be deployed within days and shipped anywhere
in the world within weeks - with almost zero-time setup. We will bring the power directly to you -  5MW - 50MW 50/60 Hz
Prices are extremely competitive also - < $300K/MW.

It doesnt get any simpler - we design, build & deliver the project to you - no five year wait for permits 

             8MW           24MW                    

            MODULAR 3-18MW

The Modular Power concept above for quick land installations and the Power Barge below for serious offshore work


       <120MW>              


The floating offshore power generation facility was initially conceived as a means of monetizing stranded offshore
natural gas, while simultaneously permitting offshore oil production in the deep waters off the Gulf of Mexico.
Interest is now being shown by IPP - Independant Power Producers to generate electrical power offshore, so as to
reduce lengthy permit procedures required by land based power plants. A permanently moored, semi-submersible
platform measuring say 300x200 ft (100x50m) supports the entire power plant and all its associated equipment.


These rugged, low maintenance, work horses demand little except fuel ... some other advantages:-

    * Proven power plant design, many plants still operating after +25 years.

    * Unlimited by power generation equipment size, technology or plant capacity.

    * Single or multi complex units located in ''easy access'' port locations


Latest News ....

We are intimately involved with the Western Power Corridor project - the biggest in the world - feel free to call me
on this, if you wish, to supply Power Barges - we need to take power directly to the raw materials source, immediately.

http://www.bloomberg.com/apps/news?pid=20601109&sid=aQ6J7V.9mFYQ

Shell-Qatar have just finished the biggest gas-fluid plant in the world - Nigeria is the next project - which is in the
WPC sector - we are intimately involved in this project also, as it is extremely power intensive, and wont wait the
years and years to get approval of land based power stations that never seem to get beyond the planning stages...

 http://www.bloomberg.com/apps/news?pid=20601116&sid=amp3xTaIp4as